English

Assisted migration · first month free

Move your server without downtime Your first month is on us

Our engineers handle the transfer of your VPS, dedicated server, cloud instance or web hosting from your current provider to our infrastructure in Paris. Send an invoice under 30 days old and your first month is free.

€0
Migration fees
24-48 h
Typical turnaround
< 15 min
Target perceived downtime
Paris
Paris, France

What we migrate

Every kind of service comes with its own constraints. Here is what we transfer in each case, and what needs particular care.

Linux and Windows VPS

We copy the running system, or install a clean one and restore your data when the existing setup is too dated. Your IP addresses change, so the DNS cutover is prepared up front.

  • Files, databases and volumes
  • Users, permissions and SSH keys
  • Scheduled jobs and system services
  • TLS certificates and redirects

Dedicated servers

Transfer to an equivalent or better machine. Partitioning and RAID level are reproduced, and your hypervisor is reinstalled if you run virtualisation.

  • Full disk image or rsync
  • RAID layout and partitioning
  • Proxmox, guest VMs and containers
  • IPMI access and out-of-band path

Cloud instances

We take over your instances on our hourly-billed cloud. Snapshots are imported and your filtering rules transcribed one by one.

  • Snapshots and data volumes
  • Security groups and rules
  • Floating IPs and load balancing
  • Bootstrap scripts and images

Web hosting and cPanel

When your provider supplies a cPanel backup, we restore it as-is. Otherwise the transfer is done by hand, account by account.

  • cPanel accounts and directory trees
  • MySQL and MariaDB databases
  • Mailboxes and forwarders
  • DNS zones and subdomains

Business email

Mailboxes are resynchronised over IMAP, preserving your folder tree and the read or unread state of every message.

  • IMAP mailboxes and folders
  • Aliases, groups and forwarders
  • SPF, DKIM and DMARC records
  • Server-side filters and rules

Our method, without downtime

The risk in a migration is not moving the data, it is the cutover. We prepare that part completely before touching anything.

  1. 1

    Compatibility audit

    We record the versions in place - PHP, MySQL or MariaDB, web server, modules and extensions - then reproduce an equivalent environment on our side. A site running PHP 7.4 dropped onto PHP 8.3 without warning breaks; this audit is what removes that first trap.

    Deliverable: the list of version gaps and dependencies to settle before cutover.

  2. 2

    Pre-synchronisation

    Your files go over with rsync and your databases as dumps, while the old server keeps serving all the traffic. Because rsync only copies what changed since the previous pass, the final sync takes just a few minutes.

    You test the service on the new machine before anyone is sent to it.

  3. 3

    Lowering the DNS TTL

    This is the step most often forgotten, and the most expensive to skip. With a 24-hour TTL, some of your visitors would still be sent to the old server for a full day after the switch. We lower it several hours ahead.

    TTL dropped to 300 seconds, then raised again once the cutover is stable.

  4. 4

    Cutover and dual running

    Final resync, A and AAAA records updated, then verification from several public resolvers to confirm they all return the new address. The old server stays powered on for the length of propagation.

    Target perceived downtime: under 15 minutes on the vast majority of setups.

Changing host does not change your URLs: unlike a domain name change, no 301 redirects are needed and your rankings are not put back in play. The only real SEO risk in a migration is the service being unreachable, and that is exactly what this method removes.

Why migrate to Infrawire

A French host, hardware we own, and engineers you can reach during the cutover.

NVMe storage and current CPUs

NVMe drives, current-generation processors and a 10 Gbps network. Your response times drop without you changing a line of code.

DDoS protection included

Volumetric filtering upstream of our network, at no extra cost and with nothing to switch on, plus continuous monitoring of our equipment.

Support reachable during cutover

A team available 24/7, and a named contact for the migration window you picked.

Data hosted in France

Our hardware sits in our own datacenter in Paris. Your data does not leave the country and stays under GDPR.

Target machine ready before transfer

Your destination server is delivered in minutes: you test it cold, then you cut over when you have decided to, not when we have.

Leaving is just as easy

If our services do not suit you, we help you move on. No technical lock-in and no exit fees.

Eligibility conditions

To qualify for the free first month, your request needs to meet the following conditions.

  1. 01

    New customers only

    The offer is reserved for new Infrawire customers. If you already hold an account with us, it does not apply.

  2. 02

    Invoice under 30 days old

    You need to attach an invoice from your current provider dated within the last 30 days. It must be legible and name the hosting service concerned.

  3. 03

    Complete migration

    The offer covers a complete migration from another host. Adding a service to an existing account is not eligible.

  4. 04

    Minimum commitment

    The free month is applied to your first month after migration. A minimum commitment may be required depending on the service chosen.

  5. 05

    Reviewed by our team

    Every request is reviewed individually. We reserve the right to decline the offer where conditions are not met or fraud is suspected.

  6. 06

    Limited-time offer

    This offer may be changed or withdrawn at any time without notice. Requests approved before any change are honoured.

Worth knowing

The free first month cannot be combined with other promotions or discounts. If you are unsure whether you qualify, better to contact us before submitting your request.

Start your migration

One request, one answer from an engineer. We come back with a cutover plan, not an automated quote.

What to have ready before writing

These four details are enough for us to size your migration and propose a window in our first reply.

  1. 1The name of your current host and the type of service to move (VPS, dedicated server, cloud, web hosting, email).
  2. 2An invoice from that provider dated within the last 30 days, for the free first month.
  3. 3The rough volume of data, and how many sites or mailboxes are involved.
  4. 4The cutover window that suits you, including overnight or at the weekend.

Send your request

Requests go through our contact form. Describe your setup in a few lines and attach your invoice: an engineer replies with a migration plan.

Open the contact form

An invoice under 30 days old is what unlocks the free first month.

Or reach us directly

Frequently asked questions

Answers to what people most often ask us before migrating.

Yes. We charge no migration fee whatsoever, whatever the type of service being moved. And if you attach an invoice from your current provider dated within the last 30 days, your first month of hosting with us is free as well.

Stay up to date with the latest offers, discounts and special promotions.

View promotions